Murchison is developing several buiding work that aim at the expansion of the distribution centers.
Recently, in the Distribution Center #3, located at Avenida Millán esq. Instrucciones, it was built the deposit #4 and building #5 is being finished. Both contribute to increase the operational capacity of this center.
The Distribution Center #1 located on Camino al Bajo de la Petiza, near to Camino Tomkinson, is also making an extension of the deposit and building a dock. With this extensions it will have an easy loading and unloading side of trucks.